Set start time of each report content element separate
4
votes
If a content element is added later to a report, the evaluation starts with the the other content elements. As exampel if i add a content element (from a new check) at the 15th of the month, i have a N/A of 50% and a OK of 50%. It would be great, if it is possible to configure a start date for the check, so that the result is not falsified.